{"id":63067,"date":"2019-12-20T16:23:13","date_gmt":"2019-12-20T14:23:13","guid":{"rendered":"https:\/\/cerveny.top-me.eu\/mosir-arena-in-oswiecim\/"},"modified":"2019-12-20T16:23:13","modified_gmt":"2019-12-20T14:23:13","slug":"mosir-arena-in-oswiecim","status":"publish","type":"post","link":"https:\/\/amit.webfusion.dev\/en\/mosir-arena-in-oswiecim\/","title":{"rendered":"MOSiR Arena in Oswiecim"},"content":{"rendered":"<ul>\n<li><strong><strong><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-7627 alignright\" src=\"https:\/\/amit.webfusion.dev\/wp-content\/uploads\/2019\/12\/zs_mosir_osvetim-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/amit.webfusion.dev\/wp-content\/uploads\/zs_mosir_osvetim-300x225.jpg 300w, https:\/\/amit.webfusion.dev\/wp-content\/uploads\/zs_mosir_osvetim-600x450.jpg 600w, https:\/\/amit.webfusion.dev\/wp-content\/uploads\/zs_mosir_osvetim.jpg 696w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/strong>Venue:<\/strong> MOSiR Arena in Oswiecim<\/li>\n<li><strong>Country:<\/strong> Poland<\/li>\n<li><strong>Year:<\/strong> 2018<\/li>\n<li><strong>Segment:<\/strong> building automation, sport venues<\/li>\n<li><strong>Implementation partner:<\/strong> PERFECT ICE s.r.o.<\/li>\n<\/ul>\n<hr style=\"clear: both;\" \/>\n<p>The MOSiR arena (Hala Lodowa MOSiR) underwent a reconstruction of the lighting system in 2018.<\/p>\n<p>AMiT devices are used as a data collection extension system and for control via a touch-panel, remote supervision and management of the webserver and visualisation of lighting control.<\/p>\n<p><strong>Utilised components:<\/strong> AMiNi4DW2, AMR-OP87<\/p>\n<hr \/>\n<p><a href=\"https:\/\/amit.webfusion.dev\/wp-content\/uploads\/2019\/12\/zs_mosir_osvetim.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-7627\" src=\"https:\/\/amit.webfusion.dev\/wp-content\/uploads\/2019\/12\/zs_mosir_osvetim-500x375.jpg\" alt=\"\" width=\"500\" height=\"375\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Venue: MOSiR Arena in Oswiecim Country: Poland Year: 2018 Segment: building automation, sport venues Implementation partner: PERFECT ICE s.r.o. The MOSiR arena (Hala Lodowa MOSiR) underwent a reconstruction of the lighting system in 2018. AMiT devices are used as a data collection extension system and for control via a touch-panel, remote supervision and management of [&hellip;]<\/p>\n","protected":false},"author":20,"featured_media":7628,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-63067","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/amit.webfusion.dev\/en\/wp-json\/wp\/v2\/posts\/63067","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/amit.webfusion.dev\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/amit.webfusion.dev\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/amit.webfusion.dev\/en\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/amit.webfusion.dev\/en\/wp-json\/wp\/v2\/comments?post=63067"}],"version-history":[{"count":0,"href":"https:\/\/amit.webfusion.dev\/en\/wp-json\/wp\/v2\/posts\/63067\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/amit.webfusion.dev\/en\/wp-json\/wp\/v2\/media\/7628"}],"wp:attachment":[{"href":"https:\/\/amit.webfusion.dev\/en\/wp-json\/wp\/v2\/media?parent=63067"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/amit.webfusion.dev\/en\/wp-json\/wp\/v2\/categories?post=63067"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/amit.webfusion.dev\/en\/wp-json\/wp\/v2\/tags?post=63067"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}